6.111 Announcements
Week of December 4, 2006
- The 6.111 lab will be open the following hours this coming week/weekend:
Mon-Thu, 12/4-12/7: 0900 - 0130
Fri, 12/08: 0900 - 2000
Sat, 12/09: 0900 - 2200
Sun, 12/10: 0900 - 0130
On Saturday and on Sunday until 1600 please enter the lab through the
sixth floor door.
- The comments and grades for the CI-M have been posted. Here's the translation
between letter grades and the numeric score: A=100, A=95, A-=90, B+=85, B=80, B-=75,
C+=70, C=65, C-=60, D+=55, D=50, F=40.
Week of November 27, 2006
- The 6.111 lab will be open the following hours this weekend:
Saturday, 12/2: 0900 - 2200
Sunday, 12/3: 0900 - 2345
On Saturday and on Sunday until 1300 please enter the lab through the
sixth floor door.
- An updated version of display_16hex.v has been posted.
The new version fixes a race condition which caused the display to not work
reliably from compilation to compilation. If you downloaded display_string.v from the
Fall 2005 website, that's also been updated.
Week of November 20, 2005
- Please upload a PDF of your checklist of deliverables by
5pm on Wed, 11/22. This checklist should include a comprehensive list
of what you're planning to demonstrate at final project checkoff.
Usually the list includes each of the major modules in your design
with a sentence or two describing their functionality and how they'll
be demonstrated. Include your more ambitious goals too (mark them "if
time permits") so we'll know all the things you're trying to get
working.
- The lab will not be open over Thanksgiving. It closes at
1515 on Wednesday, 11/22, and reopens at 1300 on Sunday, 11/26.
Week of November 13, 2006
- This week's to-do list:
- Mon-Wed: Design Presentations (schedule)
- Please upload a PDF of your presentation slides to the
course website by Wed, 11/15, at 5pm.
- The lab will not be open over Thanksgiving. It closes at
1515 on Wednesday, 11/22, and reopens at 1300 on Sunday, 11/26.
Week of November 6, 2005
- This week's to-do list:
- by Fri: Block Diagram Conference w/ TA
- Next week's to-do list:
- Mon-Wed: Design Presentations (upload PDF of slides to website).
- Please check the
schedule to
find out when your design presentation is.
- Midterm: avg = 81, stddev = 11, solutions [PDF].
You can pick up
your graded quiz from the table under the projection screen in alcove
on the south side of the 6.111 lab.
- The lab will not be open over Thanksgiving. It closes at
1515 on Wednesday, 11/22, and reopens at noon on Sunday, 11/26.
- This is the week you should nail down the details of your design and
if you need special parts get them ordered. The staff assigned to your team
will need approve any purchases made using course funds, so please talk to
them ASAP.
Week of October 30, 2005
- This week's to-do list:
- Mon: Project Abstract due (upload PDF by 5pm)
- Mon: CI-M Paper final version due (upload PDF by 5pm)
- Wed: Quiz, 7:30 - 9:30, 50-340
- Fri: Project Proposal Conference w/ staff (schedule via email)
- Midterm: avg = 81, stddev = 11, solutions [PDF].
You can pick up
your graded quiz from the table under the projection screen in alcove
on the south side of the 6.111 lab.
- We'll be assigning a staff mentor to each project team.
Your mentor will email you to schedule the Proposal Conference.
- The quiz is scheduled for Wednesday, 11/1, from 7:30p to
9:30p in 50-340. It's closed book; you can bring calculators (although
you won't need them!). The coverage is the material presentented in
lecture and in the tutorial problems. Practice exams are available
on the Handouts page.
Week of October 23, 2006
- This week's to-do list:
- Mon, Wed: lecture
- Mon: Project Teams due (email to cjt at mit.edu)
- Fri: Lab 5 checkoff by 5pm
- Next week's to-do list:
- Mon: Project Abstract due (upload PDF by 5pm)
- Mon: Revised CI-M report due (upload PDF by 5pm)
- Wed: Quiz, 7:30 - 9:30, 50-340
- Fri: Project Proposal Conference w/ staff (schedule via email)
- Wednesday is the last scheduled lecture for this term.
- The CI-M folks have posted reviews for your draft CI-M papers.
The reviewers have marked up your PDF and you can download the result
from the "Submit PDFs" page. Please make the appropriate revisions
and upload the final version of your paper by 5pm on Monday, 10/30.
- The quiz is scheduled for next Wednesday, 11/1, from 7:30p to
9:30p in 50-340. It's closed book; you can bring calculators (although
you won't need them!). The coverage is material presentented in
lecture and in the tutorial problems. A couple of practice quizzes
have been posted on the Handouts page.
Week of October 16, 2004
- This week's to-do list:
- Mon, Wed: lecture
- Fri: Lab 4 (checkoff by 5pm)
- Project Teams due next Monday, 10/23.
- Want to talk about your final project? Any of the staff can help
you brainstorm; Chris Terman will be in the lab Tue 3-5, Wed 6-10, Thu 3-5.
- Warning! Some students have had
problems using the Xilinx tools off of the shared drive (U:).
We recommend placing your project folder on the E: drive, copying
the folder back to the U: drive when you logout.
- Lab 5 has been posted.
Week of October 9, 2004
- This week's to-do list:
- Mon: it's a holiday, so no lecture, but lab open 1p - 11:45p
- Tue: student holiday, but lab open normal hours
- Wed, Fri: lecture
- Wed: CI-M report for Lab #3 due (upload to website by 5pm)
- Work on Lab 4 (checkoff by 5pm, 10/20)
- To submit a draft (in PDF form) of your CI-M paper, use
the "Submit PDFs" link to the left. When the reviewers have made
their comments, you'll be able view/download their commented PDF
files from the submissions page.
- Warning! Some students have had
problems using the Xilinx tools off of the shared drive (U:).
We recommend placing your project folder on the E: drive, copying
the folder back to the U: drive when you logout.
- Lab 5 has been posted.
Week of October 2, 2005
- This week's to-do list:
- Mon, Wed: lecture (don't forget the tutorial problems!)
- Fri: Lab 3 (checkoff by 5pm, 10/6)
- Work on Lab 3 CI-M paper (upload by 5p, 10/11)
- Lab 3 checkoff should
be completed by 5pm, 10/6. The Lab 3 written report will be used to satisfy
the CI-M requirement and is due by 5pm, 10/11.
- The slides from Dr. Perelman's CI-M talk have been posted on the handouts page.
- Lab 4 has been posted.
Week of September 25, 2006
- This week's to-do list:
- Wed, Fri: lecture
- work on Lab 3
- The lab will be open normal hours on Monday, Sept. 25.
- Lab 3 has been issued.
Checkoff should be completed by 5pm, 10/7. The Lab 3 written report
will be used to satisfy the CI-M requirement and is due by 5pm
on 10/11. Guidelines for the report can be found at the end of
the lab handout and additional writing resources are listed as part of
the Lab 3 material.
Week of September 18, 2006
- This week's to-do list:
- Mon, Wed: lecture (don't forget the tutorial problems!)
- Fri: Lab 2 checkoff by 5pm
- Gim Hom will be giving demos in the 6.111 lab (38-600) on how
to use the labkit. He'll be giving the demo at five different
times:
- Sunday, 9/17, at 2:00pm, 7:00pm and 9:00pm
- Monday, 9/18, at 7:00pm and 9:00pm
- Lab 3 has been issued.
Checkoff should be completed by 5pm, 10/7. The Lab 3 written report
will be used to satisfy the CI-M requirement and is due by 5pm
on 10/11. Guidelines for the report can be found at the end of
the lab handout and additional writing resources are listed as part of
the Lab 3 material.
Week of September 11, 2006
- This week's to-do list:
- Mon, Wed, Fri: lecture (don't forget the tutorial problems!)
- Fri: Lab 1 checkoff complete by 5pm
- Gim Hom will be giving demos in the 6.111 lab (38-600) on how
to use the logic analyzer. He'll be giving the demo at four different
times:
- Sunday, 9/10, at 7:00pm and 9:00pm
- Monday, 9/11, at 7:00pm and 9:00pm
- Lab 2 has been issued.
Week of September 4, 2006
- This week's to-do list:
- The first meeting of 6.111 will be at lecture on Wednesday,
9/6 at 1p in 34-101.
Consult the Course calendar
for schedule of lectures, labs and quizzes.
- Please take a moment to read the
Course info page which describes course mechanics and policies.
- Lab #1 has been issued. Take
the Lab Kit Signout form
to the Instrument Room (38-601) after Thursday, 9/7 at 1pm
to check out a kit of parts, tools and test equipment leads
you'll need to work on the labs.
|